| MORAKO II POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
1,254,274.94 |
Manga |
Feedback |
| KIENDEGE YOUTH POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
1,736,777.50 |
Gachuba |
Feedback |
| KIBAARA PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
1,501,932.33 |
Bomwagamo |
Feedback |
| GEKENDO DOK ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
1,044,655.40 |
Ekerenyo |
Feedback |
| GESORE PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
1,105,886.00 |
Township |
Feedback |
| NYAUTUTU PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
995,860.00 |
Bokeira |
Feedback |
| MOTOMBEBA PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
1,709,660.41 |
Kemera |
Feedback |
| GETAARI PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
2,352,972.42 |
Nyamaiya |
Feedback |
| NYARONGE PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
2,102,723.76 |
Gesima |
Feedback |
| RIBAITA PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
1,119,537.17 |
Esise |
Feedback |
| KUJA PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
On-Going
|
2,980,307.32 |
Gachuba |
Feedback |
| NYACHURURU PRIMARY ECD |
|
Education and Vocation Training |
On-Going
|
2,550,926.22 |
Bosamaro |
Feedback |
| REHABILITATION AND MANTAINANCE OF RIONSONGO, NYAISA ,MOROMBA UR-32 |
|
Roads, transport, public works and Disaster Management |
On-Going
|
9,344,400.00 |
Manga |
Feedback |
| KIENDEGE-NYACHICHI-OMOGONCHORO UR-29 |
|
Roads, transport, public works and Disaster Management |
On-Going
|
940,663.60 |
Kemera |
Feedback |
| RIABICHANGA-RIANYABIO ROAD UR-2 |
|
Roads, transport, public works and Disaster Management |
On-Going
|
4,113,877.10 |
Magombo |
Feedback |
| MANGA STADIUM CGN/143/2013-14 |
|
Roads, transport, public works and Disaster Management |
On-Going
|
45,019,998.00 |
Manga |
Feedback |
| PROPOSED SECURITY FENCE FOR GOVERNOR'S RESIDENCE |
|
Roads, transport, public works and Disaster Management |
On-Going
|
10,922,328.00 |
Township |
Feedback |
| ESANI SPRING |
|
Water, Sanitation, and Irrrigation |
On-Going
|
1,830,133.20 |
Gesima |
Feedback |
| KEMERA WATER SPRING |
|
Water, Sanitation, and Irrrigation |
On-Going
|
3,660,293.00 |
Kemera |
Feedback |
| RITONGO POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
356,782.65 |
Gesima |
Feedback |
| BITICHA POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
835,815.00 |
Rigoma |
Feedback |
| GESIMA POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
1,801,120.60 |
Gesima |
Feedback |
| ST. PETERS GETENI POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
2,001,774.30 |
Rigoma |
Feedback |
| KIIOGOTWA POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
1,971,849.10 |
Manga |
Feedback |
| GESIGORO POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
1,801,152.30 |
Bokeira |
Feedback |
| BIGEGE POLYTECHNIC |
|
Education and Vocation Training |
On-Going
|
1,722,592.00 |
Bosamaro |
Feedback |
| KEROKA MARKET |
|
Trade, Tourism and Co-operative Development |
Completed
|
24,099,139.00 |
Rigoma |
Feedback |
| MONG’ONI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,006,840.60 |
Rigoma |
Feedback |
| GIRANGO MARKET |
|
Trade, Tourism and Co-operative Development |
Completed
|
11,230,686.50 |
Gachuba |
Feedback |
| MARIBA YOUTH POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,427,926.20 |
Bosamaro |
Feedback |
| KIOGE MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
804,170.00 |
|
Feedback |
| NYAMUSI MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
739,123.00 |
Bokeira |
Feedback |
| BOBEMBE YOUTH POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,550,271.60 |
Bogichora |
Feedback |
| ITIBO MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
726,531.20 |
Itibo |
Feedback |
| ST. ANDREWS KEREMA POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,565,363.20 |
Kiabonyoru |
Feedback |
| MAKAIRO MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
739,964.00 |
Bogichora |
Feedback |
| TOMBE MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
765,036.00 |
Manga |
Feedback |
| MANGA DEB PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,812,848.04 |
Esise |
Feedback |
| NYARAMBA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
N/A |
Kiabonyoru |
Feedback |
| MAKAIRO DEB PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,853,981.00 |
Bogichora |
Feedback |
| KEGOGI MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
726,973.20 |
Kiabonyoru |
Feedback |
| NYAKONGO PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,735,998.04 |
Manga |
Feedback |
| NYARONDE MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
726,512.64 |
Nyansiongo |
Feedback |
| KENYERERE ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,751,096.60 |
Magwagwa |
Feedback |
| MOCHENWA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
727,612.60 |
Gesima |
Feedback |
| NYANCHONORIA ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,978,516.00 |
Rigoma |
Feedback |
| BONYUNYU MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
748,870.00 |
Nyamaiya |
Feedback |
| GESIMA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
769,901.00 |
Gesima |
Feedback |
| NYAGACHO PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,664,805.80 |
Mekenene |
Feedback |
| MIRUKA MKT TOILET |
|
Trade, Tourism and Co-operative Development |
Completed
|
826,256.40 |
Nyamaiya |
Feedback |
| IBARA DOK PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,854,394.60 |
Kiabonyoru |
Feedback |
| NYAKEORE PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,729,017.00 |
Bonyamatuta |
Feedback |
| INTERNET & INTERCOM CONNECTIVITY |
|
Finance ICT and Economic Planning |
Completed
|
1,856,649.60 |
Township |
Feedback |
| NYAMBOGO PRIMARY ECD CLASSROOM |
|
Education and Vocation Training |
Completed
|
2,853,981.00 |
Magombo |
Feedback |
| NYAMAURO PRIMARY ECD CLASSROM |
|
Education and Vocation Training |
Completed
|
2,500,013.44 |
Itibo |
Feedback |
| INSTALLATION OF HEALTH MANAGEMENT INFORMATION SYSTEM {HMIS} |
|
Health Services |
Completed
|
5,449,500.00 |
Township |
Feedback |
| REHABILITATION OF LEVEL 4 HOSPITAL KITCHEN |
|
Health Services |
Completed
|
13,827,136.20 |
Township |
Feedback |
| REHABILITATION OF LEVEL 4 HOSPITAL PLUMBING |
|
Health Services |
Completed
|
14,406,712.80 |
Township |
Feedback |
| ESIENYI H/C |
|
Health Services |
Completed
|
3,343,967.00 |
Bokeira |
Feedback |
| KAMBINI H/C |
|
Health Services |
Completed
|
2,104,690.10 |
Gesima |
Feedback |
| KENYORO H/C |
|
Health Services |
Completed
|
1,601,149.00 |
Itibo |
Feedback |
| MOTAGARA H/C |
|
Health Services |
Completed
|
3,263,207.00 |
Bosamaro |
Feedback |
| NYAGACHO H/C |
|
Health Services |
Completed
|
1,501,208.72 |
Mekenene |
Feedback |
| NYAIGUTA H/C |
|
Health Services |
Completed
|
|
Gesima |
Feedback |
| NYANCHONORIA H/C |
|
Health Services |
Completed
|
711,080.00 |
Rigoma |
Feedback |
| NYANDOCHE IBERE H/C |
|
Health Services |
Completed
|
2,797,340.00 |
Nyansiongo |
Feedback |
| NYANSABAKWA H/C |
|
Health Services |
Completed
|
2,347,352.34 |
Nyamaiya |
Feedback |
| NYARONDE H/C |
|
Health Services |
Completed
|
1,819,146.80 |
Nyansiongo |
Feedback |
| NYANSAGIO H/C |
|
Health Services |
Completed
|
1,140,581.60 |
Nyamaiya |
Feedback |
| ORWAKI H/C |
|
Health Services |
Completed
|
|
Bokeira |
Feedback |
| RIGOMA H/C |
|
Health Services |
Completed
|
2,050,224.81 |
Rigoma |
Feedback |
| RIKENYE H/C |
|
Health Services |
Completed
|
962,220.58 |
Rigoma |
Feedback |
| SERE H/C |
|
Health Services |
Completed
|
1,704,028.40 |
Ekerenyo |
Feedback |
| GIANCHORE H/C |
|
Health Services |
Completed
|
2,411,251.20 |
Bogichora |
Feedback |
| RIANYAMBWEKE H/C |
|
Health Services |
Completed
|
3,214,870.40 |
Bomwagamo |
Feedback |
| IKOBE H/C |
|
Health Services |
Completed
|
|
Manga |
Feedback |
| KEGINGA DISP |
|
Health Services |
Completed
|
3,407,088.20 |
Mekenene |
Feedback |
| ENSOKO DISP |
|
Health Services |
Completed
|
1,305,731.38 |
Esise |
Feedback |
| COMPLETION OF STAFF HOUSE AT NYAKONGO DISP |
|
Health Services |
Completed
|
3,598,795.42 |
Kiabonyoru |
Feedback |
| MOKOMONONI H/C |
|
Health Services |
Completed
|
|
Kiabonyoru |
Feedback |
| MOCHENWA H/C |
|
Health Services |
Completed
|
3,404,580.60 |
Gesima |
Feedback |
| EMENYENCHE H/C |
|
Health Services |
Completed
|
2,535,067.48 |
Gesima |
Feedback |
| RIGOKO DISP |
|
Health Services |
Completed
|
1,170,196.40 |
Nyansiongo |
Feedback |
| MONGORISI DISP |
|
Health Services |
Completed
|
3,709,987.40 |
Bogichora |
Feedback |
| GIRANGO DISP |
|
Health Services |
Completed
|
4,118,600.00 |
Gachuba |
Feedback |
| TINDERETI DISP |
|
Health Services |
Completed
|
|
Nyansiongo |
Feedback |
| RAITIGO DISP |
|
Health Services |
Completed
|
1,496,091.44 |
Esise |
Feedback |
| KIENDEGE DISP |
|
Health Services |
Completed
|
3,697,981.40 |
Kemera |
Feedback |
| ISOGE DISP |
|
Health Services |
Completed
|
3,838,242.80 |
Esise |
Feedback |
| NYABWERI |
|
Health Services |
Completed
|
2,306,149.60 |
Bomwagamo |
Feedback |
| BOSIANGO |
|
Health Services |
Completed
|
1,657,060.00 |
Bosamaro |
Feedback |
| KIAMANYOMBA |
|
Health Services |
Completed
|
|
Magwagwa |
Feedback |
| MOSOBETI |
|
Health Services |
Completed
|
2,484,946.00 |
Gesima |
Feedback |
| MOTONTERA |
|
Health Services |
Completed
|
1,409,724.80 |
Nyamaiya |
Feedback |
| ENDIBA |
|
Health Services |
Completed
|
2,783,014.00 |
Kiabonyoru |
Feedback |
| NYAKEGOGI |
|
Health Services |
Completed
|
2,036,414.80 |
Kemera |
Feedback |
| KERUMBE |
|
Health Services |
Completed
|
2,529,059.00 |
Mekenene |
Feedback |
| NYANKONO |
|
Health Services |
Completed
|
1,562,025.00 |
Mekenene |
Feedback |
| RIAKINARO |
|
Health Services |
Completed
|
1,846,781.48 |
Bonyamatuta |
Feedback |
| KENYENYA |
|
Health Services |
Completed
|
1,536,306.32 |
Bonyamatuta |
Feedback |
| NYAGANCHA |
|
Health Services |
Completed
|
1,248,165.80 |
Gachuba |
Feedback |
| MAGWAGWA |
|
Health Services |
Completed
|
|
Magwagwa |
Feedback |
| NYANGWETA |
|
Health Services |
Completed
|
2,523,660.00 |
Bosamaro |
Feedback |
| KEMUNCHUGU |
|
Health Services |
Completed
|
2,576,857.35 |
Bokeira |
Feedback |
| KENYERERE |
|
Health Services |
Completed
|
2,228,226.00 |
Bonyamatuta |
Feedback |
| ETURUNGI |
|
Health Services |
Completed
|
1,741,538.74 |
Kiabonyoru |
Feedback |
| IKONGE |
|
Health Services |
Completed
|
1,354,010.00 |
Itibo |
Feedback |
| MIRIRI |
|
Health Services |
Completed
|
1,775,887.20 |
Gachuba |
Feedback |
| REHABILITATION AND REPAIR OF KEROKA BUS PARK |
|
Roads, transport, public works and Disaster Management |
Completed
|
15,835,160.00 |
Rigoma |
Feedback |
| MANGA SUB COUNTY |
|
Health Services |
Completed
|
1,946,426.00 |
Manga |
Feedback |
| REHABILITATION AND REPAIR OF ACCESS ROAD PARKING |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,402,330.00 |
Township |
Feedback |
| MECHEO |
|
Health Services |
Completed
|
437,436.00 |
Kiabonyoru |
Feedback |
| COMPLETION OF NYAMIRA COUNTY COUNCIL PHASE - II |
|
Roads, transport, public works and Disaster Management |
Completed
|
18,443,043.00 |
Township |
Feedback |
| TING’A |
|
Health Services |
Completed
|
2,492,943.20 |
Bosamaro |
Feedback |
| TOMBE |
|
Health Services |
Completed
|
609,000.00 |
Manga |
Feedback |
| AMAKARA,NYARONDE ,KONA C, RIAMANOTI- UR 52 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,559,560.00 |
Nyansiongo |
Feedback |
| MAGOMBO GUCHA |
|
Health Services |
Completed
|
1,722,837.00 |
Gachuba |
Feedback |
| RIAMOSETI,RIOBWOCHA CONSTRUCTION & MAINTAINANCE (UR 23) |
|
Roads, transport, public works and Disaster Management |
Completed
|
3,245,416.50 |
Mekenene |
Feedback |
| ETONO |
|
Health Services |
Completed
|
1,685,403.50 |
Bomwagamo |
Feedback |
| MWONGORI MKRT,RIONSONGO ROAD UR-22 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,484,066.00 |
Mekenene |
Feedback |
| CHINA |
|
Health Services |
Completed
|
1,413,819.60 |
Itibo |
Feedback |
| GUCHA-MARIBA JUNC-NYASWAGO JUNC-AVACADO-MOKOMONI UR-62 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,011,614.40 |
Kiabonyoru |
Feedback |
| SIRATE |
|
Health Services |
Completed
|
1,067,942.34 |
Magombo |
Feedback |
| MAGOMBO H/C |
|
Health Services |
Completed
|
1,154,379.00 |
Magombo |
Feedback |
| ETANGI-NYANSAKIA SDA/TBC-MEBENO PRY. SCHOOL-RIOMBATI JUCTN UR-43 |
|
Roads, transport, public works and Disaster Management |
Completed
|
11,770,080.00 |
Esise |
Feedback |
| EKERENYO |
|
Health Services |
Completed
|
764,398.00 |
Ekerenyo |
Feedback |
| KEROKA-KIERIRA-RIKENYE UR-53 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,799,833.20 |
Rigoma |
Feedback |
| KIANGOSO DISP |
|
Health Services |
Completed
|
|
Kemera |
Feedback |
| KEROKA POSTA-NYASORE ACADEMY-METAMANYWA UR-55 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,430,300.00 |
Rigoma |
Feedback |
| KIOMARA DISP |
|
Health Services |
Completed
|
1,602,979.18 |
Magombo |
Feedback |
| KIENDEGE-CHARARA-NYAGECHECHE UR-28 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,302,750.00 |
Kemera |
Feedback |
| AMATERIO DISP |
|
Health Services |
Completed
|
3,145,628.00 |
Kiabonyoru |
Feedback |
| NYABONGE DISP |
|
Health Services |
Completed
|
1,723,579.04 |
Itibo |
Feedback |
| TOMBE-NYAGUKU-MIRIRI-GEKANO TBC UR-1 |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,381,562.00 |
Magombo |
Feedback |
| REFURBISHMENT OF NYAMIRALEVEL 4 HOSPITAL MAIN GATE CGN/149/2013-14 |
|
Health Services |
Completed
|
7,680,831.54 |
Township |
Feedback |
| REVERSE OSMOSIS WATER TREATMENT SYSTEM |
|
Health Services |
Completed
|
3,350,000.00 |
Township |
Feedback |
| RIAKWORO-RISA ESANI-KEBUKO-GESABAKWA UR-6 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,388,878.20 |
Gesima |
Feedback |
| RITONGO-MATUTU-IRANYA UR-7 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,148,689.67 |
Gesima |
Feedback |
| GEKANO TBC-KEGOGI TBC-NYAKEMOGWA SDA-ERONGE SDA UR-37 |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,585,640.02 |
Gachuba |
Feedback |
| MOTURUMESI-RIABAKA-GETENI-KEBOBA-KIOMOSO UR-38 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,985,410.00 |
Gachuba |
Feedback |
| RIABOTO-BIGOGO UR-31 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,454,405.18 |
Manga |
Feedback |
| NYAKARANGA JUNC-KEBOBORA-NYAKARANGA PRI.-OMOBIRO UR-4 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,004,643.44 |
Bokeira |
Feedback |
| ORWAKI BR-NYAMUSI-EGOTOTO UR-5 |
|
Roads, transport, public works and Disaster Management |
Completed
|
1,627,765.00 |
Bokeira |
Feedback |
| EKONA-NYAGEKOBOKOBO-MAGENA MARABU-ESERETI-BISEMBE UR-19 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,167,646.90 |
Magwagwa |
Feedback |
| MATORORA-ISINTA-CHINA-NYASIO-OMOKIRONDO UR-20 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,194,421.00 |
Itibo |
Feedback |
| EKERENYO-KIEMUMA-NYAMEKO UR-40 |
|
Roads, transport, public works and Disaster Management |
Completed
|
8,212,858.00 |
Ekerenyo |
Feedback |
| BWONYANGI-IKONGE DISPENSARY-BONYAMORITO UR-34 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,745,225.00 |
Nyamaiya |
Feedback |
| GESERO-GESIAGA SEC-BOKAYA-EKERUBO-SIRONGA UR-8 |
|
Roads, transport, public works and Disaster Management |
Completed
|
6,741,618.00 |
Bosamaro |
Feedback |
| NYABITE-NYANGOSO-NYAIRICHA-BOBONDO-KEBIRIGO UR-50 |
|
Roads, transport, public works and Disaster Management |
Completed
|
9,716,642.22 |
Township |
Feedback |
| NYABITE-RANGENYO-NYAKUNGURU-BONYUNYU UR-17 |
|
Roads, transport, public works and Disaster Management |
Completed
|
|
Nyamaiya |
Feedback |
| NYACHURURU - NYANGENA-TBC UR 10 |
|
Roads, transport, public works and Disaster Management |
Completed
|
4,591,767.80 |
Bosamaro |
Feedback |
| NYAMOKERI–EMONGA UR 35 |
|
Roads, transport, public works and Disaster Management |
Completed
|
2,846,830.00 |
Bogichora |
Feedback |
| KEBIRIGO-KABATIA-RIAMASARE-BOKIMO-KENYENYA-UR-11B |
|
Roads, transport, public works and Disaster Management |
Completed
|
5,292,932.00 |
Bonyamatuta |
Feedback |
| TENTE BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
5,897,904.00 |
Township |
Feedback |
| RIAGICHANA, RIAKIMAI, RIASIREMBE SPRINGS |
|
Water, Sanitation, and Irrrigation |
Completed
|
909,330.80 |
Bosamaro |
Feedback |
| RIOTWORI SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
199,280.00 |
Nyansiongo |
Feedback |
| NYARONDE SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
4,176,163.50 |
Mekenene |
Feedback |
| MACHURIRIATI WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,901,859.90 |
Rigoma |
Feedback |
| KEBIRIGO WATER SUPPLY SCHEME |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,543,780.70 |
Nyamaiya |
Feedback |
| MIRIRI BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,427,243.00 |
Gachuba |
Feedback |
| ISINTA BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,645,718.40 |
Itibo |
Feedback |
| IRINGAGRAVITY WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,673,525.60 |
Manga |
Feedback |
| GACHUBARIGOMA LINES |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,053,000.00 |
Gachuba |
Feedback |
| RIAKIMANGA&AMAKARA SPRINGS |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,464,225.40 |
Nyansiongo |
Feedback |
| NYAGWACHA SPRING WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
8,629,326.30 |
Nyamaiya |
Feedback |
| KIANUNGU BOREHOLE WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,571,135.00 |
Bosamaro |
Feedback |
| RIAMORURI WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,473,575.00 |
|
Feedback |
| MANGA GIRLS WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
9,065,181.70 |
Esise |
Feedback |
| EKERENYO SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
8,856,869.15 |
Ekerenyo |
Feedback |
| GATUTA-NYAKOME SPRING |
|
Water, Sanitation, and Irrrigation |
Completed
|
1,690,706.00 |
Manga |
Feedback |
| RIARIECHI, RIASURE, RIOMENDA, OGANGO SPRINGS |
|
Water, Sanitation, and Irrrigation |
Completed
|
5,443,215.80 |
Manga |
Feedback |
| NYAMBUNWA , RIATANDI, RIOMARE WATER SUPPLY |
|
Water, Sanitation, and Irrrigation |
Completed
|
1,009,934.60 |
Gachuba |
Feedback |
| KORONYA,NYABIGENA,MAGWAGWA, RIAKERANDI |
|
Water, Sanitation, and Irrrigation |
Completed
|
5,417,893.85 |
Magwagwa |
Feedback |
| BOGWENDO BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,049,190.00 |
Magombo |
Feedback |
| MATUNWA BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,003,260.00 |
Itibo |
Feedback |
| MARINDI BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
6,960,500.00 |
Bogichora |
Feedback |
| NYANGENA BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,432,932.00 |
Bosamaro |
Feedback |
| NYANGWARE BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,535,012.00 |
Kiabonyoru |
Feedback |
| OKANO BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
7,536,500.00 |
Bokeira |
Feedback |
| OMOKIRONDO BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Completed
|
4,334,920.00 |
Itibo |
Feedback |
| KIBWOGE POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,251,432.40 |
Kemera |
Feedback |
| MATONGO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,366,286.09 |
Magwagwa |
Feedback |
| MISAMBI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,410,750.30 |
Magwagwa |
Feedback |
| KEGWANDA POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,402,844.90 |
Rigoma |
Feedback |
| KENYERERE POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,050,659.60 |
Magombo |
Feedback |
| ST. STEPHEN EKERUBO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,188,250.40 |
Itibo |
Feedback |
| ST. ELIZABETH EMBARO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,296,481.00 |
Rigoma |
Feedback |
| SAIGANGIYA POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,260,538.00 |
Nyansiongo |
Feedback |
| MONGORI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,343,520.20 |
Mekenene |
Feedback |
| RITIBO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,238,057.60 |
Gesima |
Feedback |
| NYAIRANG’A POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,226,585.20 |
Ekerenyo |
Feedback |
| NYAIKURO POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
2,085,491.20 |
Manga |
Feedback |
| NASARI POLYTECHNIC |
|
Education and Vocation Training |
Completed
|
1,596,450.00 |
Itibo |
Feedback |
| NYABITE MARKET |
|
Trade, Tourism and Co-operative Development |
Completed
|
11,900,416.40 |
Township |
Feedback |
| REHABILITATION TO NYAMIRA SIDEWALK |
|
Roads, transport, public works and Disaster Management |
Stalled
|
1,260,000.00 |
Township |
Feedback |
| KIJAURI ROCHE -OMOKUA-MASIGE UR-51 |
|
Roads, transport, public works and Disaster Management |
Stalled
|
1,007,217.03 |
Nyansiongo |
Feedback |
| NYANGOSO-NYAMIACHO-KIOGE MARKET-BOMBO CENTRAL-KEGOGI-NYAMONURI UR-16 |
|
Roads, transport, public works and Disaster Management |
Stalled
|
|
Bomwagamo |
Feedback |
| MIRUKA-NYANDOCHE IBERE UR-18 |
|
Roads, transport, public works and Disaster Management |
Stalled
|
2,797,699.20 |
Nyamaiya |
Feedback |
| KEBIRIGO-KABATIA-RIAMASARE-BOKIMO-KENYENYA UR 11 |
|
Roads, transport, public works and Disaster Management |
Stalled
|
2,869,344.00 |
Bonyamatuta |
Feedback |
| GESONSO-NYANGOSO AND GESORE JUNC-BUNDO UR-47/48 |
|
Roads, transport, public works and Disaster Management |
Stalled
|
1,191,600.00 |
Township |
Feedback |
| KINENI BOREHOLE |
|
Water, Sanitation, and Irrrigation |
Stalled
|
3,200,000.00 |
Esise |
Feedback |